I applied through a staffing agency. The process took 2 days. I interviewed at Dell Technologies (Bengaluru)
Interview
I had one technical face to face interview followed by managerial round. Both the rounds went well and the questions asked were more of real time scenarios and it was one of the best interviews I have ever attended. I think the problem for not selecting me was the notice period!!
I applied online. The process took 1 week. I interviewed at Dell Technologies (Bengaluru) in Sep 2012
Interview
Easy, Prepare on Agile, Waterfall, Testing Strategy, Automation, C# CodedUI, and Selenium. Basic of SQL. Processes. Types of testing. MTM and TFS. just keep on talking talking talking. as you impress the interviewer you ll be selected. People in testing are zero in technical stuffs, they need people who can talk and resolve the issue then n there. you should be friendly with everyone. no technical knowledge required. good place to stay if you need comfirt zone
Defect life cycle,Enough you will be in
Interview questions [1]
Question 1
what is test strategy
what is regression test
what is difference btwn sev and pri
MTM and TFS
Defect life cycle
SDLC, Agile process
I applied through a staffing agency. The process took 2 weeks. I interviewed at Dell Technologies (Bengaluru) in Jan 2012
Interview
First 3 Rounds (Screening, Aptitude Test,Group Discussion)was conducted by consultancy management and post consultancy selection, two rounds (Technical Round with management, HR) was held in DELL campus.
Screening Round - Short introduction and Verify the documents along with appointment letter
Aptitude Test - Math + Logical and Technical questions
Group Discussion - 15 candidates per slot and selecting 0-3 candidates as per performance
Technical Round - 3 stage interview (High level, Moderate and real scenarios)
HR - Causal talk and handover the offer latter