Product Project Manager Interview Questions

116,942 product project manager interview questions shared by candidates

How would I design the elevators for a new 40 story office building that had an average of 100 people per floor to most efficiently fill and empty the building given a standard 9-5 workday and traffic conditions in my city? The answer needed to be completely detailed, including expected passengers per car, time per stop, average floors stops per trip at various hours, etc.
avatar

Senior Product Manager

Interviewed at Google

4.4
Jul 13, 2012

How would I design the elevators for a new 40 story office building that had an average of 100 people per floor to most efficiently fill and empty the building given a standard 9-5 workday and traffic conditions in my city? The answer needed to be completely detailed, including expected passengers per car, time per stop, average floors stops per trip at various hours, etc.

You are the PM of the "share" feature(which people use to share on feed, as a private message etc.). How would you measure success of this feature? What metrics would you use and why? Out of the ones you have mentioned, which is the most important and why? Followup questions: 1) Your team has implemented a change in the "share" and released it for A/B testing, where you realized that there is increase of 20% usage of the feature. would you decide to release it? 2) You have recently released the new feature, and you were informed by all local sites (Facebook sites in each country) that the usage has indeed increased by 20%, but the overall global data shows only 5% increase. How is this possible?
avatar

Product Manager

Interviewed at Meta

3.6
Feb 13, 2020

You are the PM of the "share" feature(which people use to share on feed, as a private message etc.). How would you measure success of this feature? What metrics would you use and why? Out of the ones you have mentioned, which is the most important and why? Followup questions: 1) Your team has implemented a change in the "share" and released it for A/B testing, where you realized that there is increase of 20% usage of the feature. would you decide to release it? 2) You have recently released the new feature, and you were informed by all local sites (Facebook sites in each country) that the usage has indeed increased by 20%, but the overall global data shows only 5% increase. How is this possible?

Viewing 21 - 30 interview questions

See Interview Questions for Similar Jobs

Glassdoor has 116,942 interview questions and reports from Product project manager interviews. Prepare for your interview. Get hired. Love your job.