Some of the strategic tools (e.g. IM) used are built or configured from a global perspective, and may not meet the response requirements for a specific department. Such a change will need multiple rounds of evaluation globally and signoff, typically a longer change cycle. This introduces the usage of alternate ticketing tools, needing to maintain sync between ticketing in multiple systems for reasons of consistency.