Glassdoor users rated their interview experience at Schneider Electric as 100% positive with a difficulty rating score of 3 out of 5 (where 5 is the highest level of difficulty). Candidates interviewing for Trainee Sales and rated their interviews as the hardest, whereas interviews for Trainee Sales and roles were rated as the easiest.
Here are the most commonly searched roles for interview reports -
I applied through college or university. I interviewed at Schneider Electric (Bengaluru) in Jun 2017
Interview
The initial aptitude round was easy and they announced the results on the same day
we were called for an interview by the next week in the college only .
the interview atmosphere was very good , The panel (of two) were very supporting and heard what we had to say , I had two tech rounds by the same panel (almost 15 minutes each)
next was HR round , and it went on for about 30-35 minutes
Basic HR questions were asked and i was told that they would be announcing the results later
overall the interview was good and i had done very well , i was confident of getting the job
the results came in the next week , and i was surprised to fsee four EEE and IEM ladies getting selected for the post of a production engineer.
I was kept on hold for a week and later another girl was selected instead of me
I applied through a recruiter. I interviewed at Schneider Electric (Chandigarh) in Nov 2015
Interview
1. Required SAP knowledge
2. P2P knowledge
3. Good experiance ( at the time of interview i am having 6 years )
1. 1st Round :- Face 2 Face by Deptt. ManagerQuestions asked in Interview was very general , most of them are related to P2P process and they asked me to to do some accounting entries as well
2. 2nd Round :- Telephonic by HOD :- nothing specific just to know about you and your communication skills and past experiance
Interview questions [1]
Question 1
1. About youself
2. P2P knowledge
3. SAP knowledge
I applied through other source. I interviewed at Schneider Electric in Dec 2013
Interview
Two separate panel interviews with various managers, (plant, HR, production, EHS, engineering, production etc), lasting about hour and half each. This was filled by a plant tour lasting about and hour